Descargar Imprimir esta página

Maxeon SunPower Reserve Instrucciones De Instalación página 37

Sistema de almacenamiento de energía para el hogar
Ocultar thumbs Ver también para SunPower Reserve:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

To connect the backup connector:
1.
Approx. 24mm
For "L" and "N"
Approx. 26mm for PE
Three-core (L, N and PE) outdoor copper cable
Conductor cross-section: 4-6mm²
3.
Plug the connector into the socket and tighten firmly
Please ensure connector has been correctly installed.
TIP
6.3.4. CT Rating
Item
CT
© 2023 Maxeon Solar Technologies, Ltd. All rights reserved. | 547143 Revision B - June 2023
Specifications included in this document are subject to change without notice
8mm
1
2
For Australia and New Zealand installation sites, the Neutral is switched
internally between the Grid and Backup Ports of the inverter. The backup
port Neutral must be connected to the site Neutral bar.
Current
100 A
2.
Insert the crimped conductors, L, N and PE into the corresponding
terminals and tighten the screws (torque 1.5±0.1N-m)
Assemble the locking cap, threaded sleeve and swivel nut together
Scenarios
CT
PE
N
L
36

Publicidad

loading

Este manual también es adecuado para:

Reserve-inv-1-p5-l1-intReserve-bat-1-dc-10.1-int