6.0
Electrical Connection
6.1.
Cable Requirements for Connection
6.2.
Connecting Additional Grounding
6.3.
AC Connection
6.3.1.
Requirements for the AC Connection
6.3.2.
Selecting Suitable AC circuit Breaker
6.3.3.
Grid and Backup Connection
6.3.4.
CT Rating
6.3.5.
CT Connection
6.4.
PV Connection
6.5.
Electrical Connection Between the Inverter and Battery Packs
6.5.1.
Electrical Connection Between the Inverter and First Battery
6.5.2.
Communication cable connection
6.5.3.
Power cable connection
6.5.4.
Electrical connection for expansion batteries
6.5.5.
Other Communication Connection of Inverter
6.6.
Mounting the Battery and Inverter Appearance Parts
6.7.
Mounting the Screw Plugs (option)
7.0
Startup and Shutdown procedure
7.1.
Startup procedure
7.2.
Shutdown procedure
7.3.
Checks before start-up
8.0 Set up a new System (Commissioning)
8.1.
Connect Reserve to internet
8.2.
Download and Install the SunPower One app
8.3.
Commissioning SunPower Reserve
8.4.
Switch On the System and Check System Status
8.5.
Check the AC backup (if available)
8.6.
Instruct the End User to Install the SunPower One App
9.0
Maintenance and Troubleshooting
9.1.
Routine Maintenance
9.2.
Troubleshooting
9.2.1.
Inverter Error Troubleshooting
9.2.2.
Inverter Error Description
9.2.3.
Battery Protection Description
9.2.4.
Battery Error Description
© 2023 Maxeon Solar Technologies, Ltd. All rights reserved. | 547143 Revision B - June 2023
Specifications included in this document are subject to change without notice
31
31
32
33
33
34
34
36
37
39
40
40
40
41
43
44
46
48
49
49
49
50
51
51
52
52
53
53
53
54
54
54
55
57
59
60
3