Descargar Imprimir esta página

Maxeon SunPower Reserve Instrucciones De Instalación página 54

Sistema de almacenamiento de energía para el hogar
Ocultar thumbs Ver también para SunPower Reserve:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

TIP
8.4 Switch On the System and Check System Status
Please make sure the PV switch and battery breakers and all the breakers connecting to the
product are ON.
8.5 Check the AC backup (if available)
Switch ON an electrical appliance connected on the backup load port of the energy storage
inverter.
Switch ON the AC breaker on the backup port of the energy storage inverter.
Switch OFF the external AC breaker between the grid and the energy storage inverter.
The product will enter the AC-Backup mode at once.
Check if the electrical appliance on the backup side continues to operate.
CAUTION
8.6 Instruct the End User to Install the SunPower One App
Please make sure that the home owner has downloaded the APP and activated their account
via the welcome email.
TIP
© 2023 Maxeon Solar Technologies, Ltd. All rights reserved. | 547143 Revision B - June 2023
Specifications included in this document are subject to change without notice
In step 4 of commission process, available parameters changes
depending on configuration selected. It is important to check correct
values are interested at this stage.
During commissioning, if the LED indicators on the display panel of the
inverter show red or the LED indicators on the display panel of the battery
is yellow, please refer to the troubleshooting section (9.0)
The warranty registration of the SunPower Reserve is completed when the
home owner has activated their customer account
53

Publicidad

loading

Este manual también es adecuado para:

Reserve-inv-1-p5-l1-intReserve-bat-1-dc-10.1-int