Descargar Imprimir esta página

Maxeon SunPower Reserve Instrucciones De Instalación página 41

Sistema de almacenamiento de energía para el hogar
Ocultar thumbs Ver también para SunPower Reserve:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

5. Remove the waterproof caps.
If there is a used terminal, please seal with the cap.
6.5 Electrical Connection Between the Inverter and
Battery Packs
6.5.1. Electrical Connection Between the Inverter and First
Battery
Electrical connection instructions:
1.
Take out the Grounding cable from the inverter package.
2. Connect the Grounding cable to the inverter and battery packs.
6.5.2. Communication cable connection
Communication connection instructions:
1.
Take out the battery communication cable from the inverter package
2. Lead the battery communication cable through the cable gland of the COM connection
cover of inverter, don't tighten the swivel nuts of the cable glands, insert the RJ45 plug to
the BMS communication port of the inverter. Insert the other RJ45 plug to the relative RJ45
sockets provided by battery.
Note: The magnetic ring on the battery communication cable must be close to the inverter
side.
© 2023 Maxeon Solar Technologies, Ltd. All rights reserved. | 547143 Revision B - June 2023
Specifications included in this document are subject to change without notice
6. Insert the connectors into the terminal until an
audible click is heard.
3
2
1
click
click
40

Publicidad

loading

Este manual también es adecuado para:

Reserve-inv-1-p5-l1-intReserve-bat-1-dc-10.1-int