Descargar Imprimir esta página

STEINEL professional Serie Manual Del Usuario página 45

Ocultar thumbs Ver también para professional Serie:

Publicidad

5. Installation
Preparing for installation
• Check all components for damage. Do not use the
product if it is damaged.
• Select an appropriate site to install the product.
– Take reach into consideration.
– Take reach and motion detection into consideration.
– Vibration-free.
– No obstacles in detection zone.
– Not in explosive atmospheres.
– Not on normally flammable surfaces.
Mounting procedure, concealed installation
5.1
I
O
• Check to make sure the power supply is switched OFF.
• Connect to mains power supply.
% "4. Electrical connection"
– 45 –
GB
Contents

Publicidad

loading

Este manual también es adecuado para:

Professional pd ir 4360-8 eco dali-2 ipdProfessional pd ir 4360-24 eco dali-2 ipd4007841 088231400784108827940078410881944007841088255