To fix the threaded rod l to the ceiling mounting plate G, turn nut H at least 20
mm onto the upper part of the threaded rod.
Screw the threaded rods into the ceiling mounting plates as far as they will go
(at least 10 mm!). Then tighten the nut.
Make sure that the lower part of the mounting frame is perfectly in
balance. An installation of the mounting frame that is not levelled
will result in malfunction and damage to the screen.
G
H
K + J
Lift up the pre-assembled installation
frame and insert the threaded rods into
the holes in part C.
Secure the mounting frame with washers
K and collar nuts J.
H
I
C
12