Tighten the belts and verify that they remain attached to the upper edge
of the passage; lift the unit a few centimetres, and only after having
verified that the load is stable, remove the pallet while taking care not to
interpose any part of the body in order to prevent any risk of crushing or
impact due to the load falling or moving suddenly. Carefully carry the
unit to the installation site. Lower the unit carefully and fix it into place.
II.4.3
STORAGE CONDITIONS
The units cannot be stacked. The temperature limits for storage are -
20÷50°C; evitare di esporre l'unità al diretto contatto con i raggi solari,
piogge, vento e sabbia.
II.5
INSTALLATION INSTRUCTIONS
DANGER!
Installation must only be carried out by skilled
technicians, qualified for working on air
conditioning and refrigeration systems. Incorrect
installation could cause the unit to run badly, with a
consequent deterioration in performance.
DANGER!
The unit must be installed according to national or
local standards in force at the time of installation.
The documentation for accessories supplied loose
included with each kit.
DANGER!
The machine is designed for outdoor installation.
Segregate the unit if installed in areas accessible to
persons under 14 years of age.
DANGER!
Some internal parts of the unit may cause cuts. Use
suitable personal protective equipment.
DANGER!
When the outdoor temperature is around zero, the
water normally produced during the coil defrosting
could form ice and make the flooring near the unit
installation area slippery.
If the unit is not fixed to anti-vibration mounts (KSA), once it has been
set on the ground, it must be firmly bolted down to the floor using M6
metric threaded bolts. Slots are provided in the base for this purpose.
IOM_EQUI PF-EQUHI PF_117a128_207983_200101_ES-EN-FR-DE-IT
II.5.1
INSTALLATION SITE REQUIREMENTS
The installation site should be chosen in accordance with the provisions
of Standard EN 378-1 and in keeping with the requirements of Standard
EN 378-3. When selecting the installation site, risks posed by accidental
refrigerant leakage from the unit should also be taken into
consideration.
II.5.1.1
Indoor installation
The technical areas intended for the installation of cooling units must
always be constructed in compliance with current accident prevention
laws in force in the relative country.
Normally, technical areas are not solely constructed for the installation
of cooling machines. In many cases, there may also be other equipment
within, such as burners that run on gas, solid fuel or liquid fuel, thereby
resulting in an increase in personal safety hazards.
II.5.1.2
Front panel removal
If it is difficult for the machine to pass through openings, temporarily
remove the front panel and the fan to reduce the depth of the unit.
Refer to the "Attachments" section for the instructions.
II.5.2
CLEARANCE AND POSITIONING
IMPORTANT!
Before installing the unit, check the noise limits
allowed in the place where it will be used.
IMPORTANT!
The unit should be positioned to comply with the
minimum recommended clearances, bearing in
mind the access to water and electrical
connections.
The unit is envisioned for indoor installation. The unit should be
correctly levelled and positioned on a supporting surface capable of
sustaining its full weight. It must not be installed on brackets or shelves.
EQUI PF-EQUHI PF 117÷128 P0lPI0lP1
a
e
2
c
Model
a
mm
b
mm
c
mm
d
mm
e
mm
f
mm
KRMA – Flow anti-vibrating fitting.
1
KRAS – Intake duct fitting
2
29
f
1
b
1
d
117
124
128
250
250
250
500
500
500
250
250
250
500
500
500
1500
1500
1500
800
800
800