Tabla De Contenido; Thanks For Choosing Toto; Common Tools Needed; Before Installation - Toto CST442 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Thanks for Choosing TOTO! .................2
Common Tools Needed .........................2
Before Installation ...................................2
Included Parts .........................................3
Care and Cleaning ..................................3
The mission of TOTO is to provide the world with healthy, hygienic and more
comfortable lifestyles. We design every product with the balance of form and
function as a guiding principle. Congratulations on your choice.
• 12" pipe wrench
• 10" adjustable wrench
• Carpenter's Level
• Tape Measure
• Plier
• Flexible Supply Tube / Connector
• Supply Stop Valve
„
Read instruction manual before installation.
„
Maintenance and warranty information included in manual, DO NOT DISCARD.
„
Locate water supply and drain pipe.
IMPORTANT!
For back-to-back installations, Tornado flushing systems require a WYE fitting
incorporated into the toilet drain system. Please contact your builer/contractor for
additional information prior to installation.
„ Verify enough space is available for installation and
unobstructed operation of equipment
(doors opening/closing, etc...). Failure to do this
beforehand may result in incorrect product installation
and possible malfunction.
„ Thoroughly flush the supply pipes of dirt and debris.
Proceed to install the supply hose to the tank and
make sure you do not damage the end connection of
the hose.
„ After installation, verify water and electricity are
working properly.
„ Gaps between the discharge pipe and the floor
should be filled with mold-resistant silicone-based
seal material (Mediseal).
„ Minimum required water pressure (flowing): 7 PSI at
2.64 Gal/min (0.05 MPa at 10 L/min). Maximum water
pressure (static): 108 PSI (0.75 MPa).
TABLE OF CONTENTS

THANKS FOR CHOOSING TOTO!

COMMON TOOLS NEEDED

MATERIALS REQUIRED:

BEFORE INSTALLATION

Installation Procedure ............................4
Maintenance Instructions .......................8
Warranty ................................................10
Rough-In Dimensions ..........................29
• Screwdriver
• Putty Knife
• Drill
/
" drill bit for wood floor installation
11
64
/
" drill bit for concrete/tile installation
5
16
• Mounting (T) Bolts & Nuts (2pc)
• Wax Ring / Seal
2
Double Combination WYE / 1/8 Bend
YES
Double Sanitary Tee / Sanitary Cross
NO

Publicidad

Tabla de contenido
loading

Tabla de contenido