Toto CST442 Manual De Instrucciones página 5

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.
Align the toilet perpendicular to the
back wall and parallel to side walls; it
should not sit crooked or diagonal
(see illustration 4).
5.
Make sure it's aligned before securing.
6. Install the side screws to the mounting
blocks. Cover the screw head with the
provided screw caps (see illustration 5).
NOTE: THREE POINTS OF CONTACT
The toilet bowl has three points of contact,
which will actually contact the bottom of
the toilet tank when properly installed. The
location of these points can be seen on the
bowl at the tank receiving area. The three
points are front left (1), front right (2), and
back center (3). Recall these three points
during the Toilet Tank installation.
7.
Place the tank upside down onto some pad-
ding. Inspect the smaller fill valve nut and
larger flush valve nut for a secure connection
(see Illustration 6).
Try to tighten the nuts with your hands. If loose,
tighten the nut hand tight and an additional
1/4 turn for the smaller fill valve nut and an
additional 1/2 turn for the larger flush valve nut.
Place the tank-to-bowl gasket onto the flush
valve nut.
While pressing down, spread the gasket over
the nut until the gasket touches the bottom of
the tank. A slight gap between the tank bot-
tom and the gasket is allowable.
INSTALLATION PROCEDURE
Ill. 4
A
Ill. 5
A
Points of Contact
1
Ill. 6
Fill Valve Nut Flush Valve Nut
5
3
2
Tank to Bowl
Gasket

Publicidad

Tabla de contenido
loading

Tabla de contenido