6.2
Tanks
Primary tank
Note!
Optional heat insulation is available for primary tanks, 4.6 "Optional
equipment and accessories", 29.
Connection: G1"/ 6 bar
Type
Ø "D"
[mm]
200
634
300
634
400
740
500
740
600
740
800
740
1000 / 740
740
1000 / 1000
1000
1500
1200
2000
1200
3000
1500
4000
1500
5000
1500
7
Installation
DANGER
Risk of serious injury or death due to electric shock.
If live parts are touched, there is risk of life-threatening injuries.
•
Ensure that the supply cable to the device is disconnected and secured
against being switched back on.
•
Ensure that the system is secured and cannot be reactivated by other
persons.
•
Ensure that installation work for the electric connection of the device is
carried out by an electrician, and in compliance with electrical locally
applicable electrical engineering regulations.
CAUTION
Risk of injury due to pressurised liquid
If installation, removal or maintenance work is not carried out correctly, there
is a risk of burns and other injuries at the connection points, if pressurised
hot water or hot steam suddenly escapes.
•
Ensure proper installation, removal or maintenance work.
•
Ensure that the system is de-pressurised before performing installation,
removal or maintenance work at the connection points.
CAUTION
Risk of burns on hot surfaces
Hot surfaces in heating systems can cause burns to the skin.
•
Wear protective gloves.
•
Please place appropriate warning signs in the vicinity of the device.
Secondary tank
Weight
H
[kg]
[mm]
[mm]
37
1060
146
54
1360
146
65
1345
133
78
1560
133
94
1810
133
149
2275
133
156
2684
133
320
2130
350
465
2130
350
565
2590
350
795
2590
380
1080
3160
380
1115
3695
380
Variomat Basic — 09.09.2022-Rev. C
CAUTION
Risk of injury due to falls or bumps
Bruising from falls or bumps on system components during installation.
•
Wear personal protective equipment (helmet, protective clothing,
gloves, safety boots).
Note!
Confirm that installation and start-up have been carried out correctly
using the installation and commissioning certificate. This action is a
prerequisite for the making of warranty claims.
–
Have the Reflex Customer Service carry out commissioning and
the annual maintenance.
7.1
Installation conditions
Prior to shipping, this device was carefully inspected and packed. Damages
during transport cannot be excluded.
Proceed as follows:
1.
Upon receipt of the goods, check the shipment for
•
completeness and
h
•
possible transport damage.
2.
Document any damage.
3.
Contact the forwarding agent to register your complaint.
7.2
Preparatory work
Condition of the delivered device:
•
Check all screw connections of the device for tight seating. Tighten the
screws as necessary.
Preparing the device installation:
•
No access by unauthorised personnel.
•
Frost-free, well-ventilated room.
–
Room temperature 0 °C to 45 °C (32 °F to 113 °F).
•
Level, stable flooring.
–
Ensure sufficient bearing strength of the floor before filling the
vessels.
–
Ensure that the control unit and the vessels are installed on the same
level.
•
Filling and dewatering option.
–
Provide a DN 15 filling connection according to DIN 1988 - 100 and
En 1717.
–
Provide an optional cold water inlet.
–
Prepare a drain for the drain water.
Electrical connection, 6 "Technical data", 32.
•
•
Use only approved transport and lifting equipment.
–
The carrying lugs on the vessels are designed for vertical positioning
according to DIN 28086. Their sole purpose is an installation aid
during positioning.
Where vessels have two carrying lugs, a traverse must be used for
transport.
•
No transverse and longitudinal acceleration forces were allowed for when
dimensioning the product. If loads of this type could occur, a special proof
must be provided and agreed.
7.3
Execution
ATTENTION
Damage due to improper installation
Additional device stresses may arise due to the connection of pipes or system
equipment.
•
Pipelines must be connected so there are no residual forces and
torques and must be routed so they are free from vibrations.
•
If necessary, provide support structures for the pipelines or equipment.
•
If you have any questions, please contact Reflex After Sales & Service.
For installation, proceed as follows:
•
Position the device.
•
Complete the primary tank and the optional secondary tanks.
•
Create the water-side connections of the control unit to the system.
•
Create the interfaces according to the terminal plan.
•
Install the water connections between optional secondary tanks to each
other and to the primary tank.
Installation
English — 33