Descargar Imprimir esta página

Naterial ZEFIR AW2 RM 3.95x3 Instrucciones De Montaje página 86

Ocultar thumbs Ver también para ZEFIR AW2 RM 3.95x3:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15
FR
ES
PT
I T
EL
PL
UA
RO
NL
1. GENERAL
EN
WARNING: Important safety instructions. Please follow all the
instructions because a faulty setup may result in serious injuries.
Follow all safety instructions to avoid damage through improper use! Follow all warning notices on
the appliance.
Keep this instruction manual for future use. Should this appliance be passed on to a third party, this
instruction manual must be included.
Use this appliance only for its intended use.
No responsibility is accepted for damage resulting from improper use or non-compliance with
these Instructions.
2. ASSEMBLY
The installation must be conform to the regulation of the country.
A horizontal distance of at least 0.4 m is to be maintained between fully unrolled driven part and
any permanent object.
Means for disconnection having a contact separation in all poles must be incorporated in the fixed
wiring in accordance with the wiring rules.
When you are ready to unpack and assemble the awning, make sure that you have the appropriate
1.8
86

Publicidad

loading

Este manual también es adecuado para:

Zefir aw2 rm 4.95x3Zefir aw2 rm 2.95x2,5