Installatidff°l tructions
PREPARATION
TOOLS AND PARTS NEEDED
. Large flat-blade screwdriver
. Phillips screwdriver
3/8" socket and ratchet
Saw
Carpenter's square
Pipe wrench
Gas line shut off valve
Pipejoint sealant for use with gas connections that
resists action of LP gas
For flexible connection where local codes permit:
. Flexible metal tubing (same 3/4" or 1/2" I.D. as gas
supply line)
. Flare union adapter for connection to supply line
(3/4" NPTx 3/4" I.D.or 1/2" NPTx 1/2" I.D.)
Flare union adapter for connection to regulator
(1/2" NPT x 3/4" I.D. or 1/2" I.D.)
For rigid connection:
Pipe fittings as required
IM PO RTA NT
Hotor Clearance-Provide
2" min. (5.1 cm) cabinet
clearance to motor for cooling purpose.
NOTE:Where possible, 6" (15.2 cm)is recommended
for motor/blower service.
Side Clearance-Grills
installed near a side wall should
allow a minimum clearance of 8" (20.3 cm).
You must allow room enough to remove and empty
grease container(s).
CAUTION:Warranty isvoid on equipment installed
other than as recommended by GE. Recommended
wall caps and transitions must be used for proper
operation and installation.
PREPARING FOR INSTALLATION
Tie down
bolt on each
end
Pressure Regulator
Wiring Box Cover
*Blower can be swiveled
Grease Container
29" ± ¼_d'
VS'
53.5 ± 16 cm
22.2 cm
2.38 cm
Minimum
Minimum
Clearance
Clearance
Select appropriate d
cutout. (Seeducting
installation instructions.)
4£1d'
10.64 cm
d
_A
f2ssaunCe
Cle aran__J_L_
U_"'J
I
_-Grease
2" _
L z4_/'_J.__12_A"__J Container
5 08 'c_
m-
.__
•
vr--s;.8 s c_ -_ s%-7-_
Minimum
Clearance
* Blower may be rotated for horizontal or vertical direction by loosening
nuts around blower inlet. Accessible inside ventilation chamber.
20