Descargar Imprimir esta página

GE MGI09CABC3 Manual De Uso Y Cuidado página 120

Publicidad

Idiomas disponibles

Idiomas disponibles

Additional refrigerant according to pipe length
Connective Pipe
Air purging
Length (m)
method
< Standard pipe
Vacuum pump
length
> Standard pipe
Vacuum pump
length
CAUTION: DO NOT MIX REFRIGERANT TYPES.
Electrical and Gas Leak Checks
Electrical Safety Checks
After installation, confirm that all electrical
wiring is installed in accordance with local
and national regulations, and according to
the Installation section.
120
Additional amount of refrigerant
N.A.
Liquid side: Ø 6.35 mm (0.25")
R22:
(Pipe length - standard length) x
30 g/m
(Pipe length - standard length) x
0.32 oZ/ft
Inverter R410A:
(Pipe length - standard length) x
15 g/m
(Pipe length - standard length) x
0.16 oZ/ft
Fixed-frequency R410A:
(Pipe length - standard length) x
20 g/m
(Pipe length - standard length) x
0.21 oZ/ft
Before Test Run
Check Grounding Work.
Measure grounding resistance by visual de-
tection and with grounding resistance tester.
Grounding resistance must be less than 4.
NOTE: This may not be required in some US
locations.
Liquid Side: Ø 9.52 mm (Ø 0.375")
R22:
(Pipe length -standard length) x
60g/m
(Pipe length -standard length) x
0.64 oZ/ft
Inverter R410A:
(Pipe length - standard length) x
30 g/m
(Pipe length - standard length) x
0.32 oZ/ft
Fixed-frequency R410A:
(Pipe length - standard length) x
40 g/m
(Pipe length - standard length) x
0.42 oZ/ft

Publicidad

loading

Este manual también es adecuado para:

Mgi12cabc3Mgi12cdbc3Mgi18cdbc3Mgi24cdbc3