Descargar Imprimir esta página

ESAB LAE 1000 Instrucciones De Uso página 23

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 37
ENGLISH
INSTALLATION
1.
lnstallation must be carried out by a qualified electrician.
2.
Make sure the welding rectifier is set up for the
available
mains supply before connecting to the mains.
3.
lf
the control voltage
is
switched between
42Y
and
110
V
make sure the revers-
ible rating plate shows the correct voltage.
4.
For information on power cable area and fuse size, refer to technical data.
5.
Connect
the
power cable to
the
rectifier in accordance with local regulations, and
make sure the correct fuse
is
fitted
in
the fuse box.
6.
Check that the cooling vents on
the
rectifier are not obstructed.
MAIN
TRANSFORMIH
KJU
K9
SEK.IlOV
K9
SEK
.42V
220V
2
30V
50H
z
f
-l[ü0
112]'024
K30
IE
12)02
4
IE
o2
JBOV
400v
50H
z
(-
\_
1
2
t024
112)C24
r8
E
cJ6
ffit
t,12
)C24
28
0r8
o29
036
lir-,llæ51
L--Jt
I
(-'u-u'¡gj,,
K30
1
I
(t
2
)O24
41
5V
!r0l-i
z
rE
f-'=ì
(:¡¿u'gJ
I
(t2
lo24
K30
500v
50H
z
rE
o2
28
ì
1E
oJ
f
:l
[üß
KJO
230V
õ0H
z
18
029
0J6
o29
0J6
8t9
18
28
24
4
00v
60H
z
12)O24
t8
o29
0J6
-01
I
r-
\-
)
I
K30
4
40V
60H
z
't
I
o29
036
029
0J6
f'=
t
L-qu:
-uJ
if
s-
0
0
K30
550V
6OH
z
056
8t9
o?.9
o29
o2
o2
l
018
036
469
8¿E-0Ol
ba17d12e
-21 -

Publicidad

loading