Commissioning [Specialist]; Accessories: Compression Fitting (Not Included In Delivery) - PAW DN 25 Manual De Instrucciones Para El Montaje Y Manejo

Distribuidor modular
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

4 Commissioning [specialist]

4 Commissioning [specialist]
1. After the distribution manifold is installed, put the heating circuit onto the manifold
and firmly tighten the thread connections.
2. Connect the distribution manifold to the boiler (do not forget the sealings).
3. Check all screw connections and tighten them if necessary.
4. Carry out the pressure test.
5. Mount the front shell of the distribution manifold.
4.1

Accessories: compression fitting (not included in delivery)

The connection to the heating installation can be carried out fast, pressure-proof and without
soldering when you use the optionally available compression fittings.
Not included in
the scope of delivery!
2017/01
1. Push the union nut ② and the cutting ring ③ onto the
copper pipe ①. The pipe must protrude at least 3 mm
from the cutting ring in order to ensure the force
transmission and the sealing.
2. Insert the support sleeve ④ into the copper pipe.
3. Insert the copper pipe with the plugged-on individual
parts (②, ③ and ④) all the way into the housing of
the cutting-ring fitting ⑤.
4. First screw the union nut ② manually.
5. Tighten the union nut ② by rotating one full turn.
Secure the housing of the compression fitting ⑤
against distort in order to avoid damaging the
sealing ring.
993x1x3-mub-ml – V01
19

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dn 32

Tabla de contenido