English
OPERATING THE OPTIONAL THREE-STAGE PERMANENTLY ATTACHED I.V. POLE
Note: The three-stage permanently attached I.V. pole is an option and may have been installed at either the head,
foot or both ends of the stretcher. The choice was made at the time that the stretcher was purchased.
To use the three-stage permanently attached I.V. pole:
1.
Lift and pivot the pole from the storage position and push down until it is locked into the receptacle.
2.
To raise the height of the pole, pull up on the telescoping portion (A) until it locks into place at its fully raised
position.
3.
For a higher I.V. pole, pull up on section (B). Release section (B) at any desired height and it will lock into place.
4.
Rotate the I.V. hangers (C) to the desired position and hang the I.V. bags.
5.
To lower the I.V. pole, push up on the red portion of grip (D) while holding onto section (B) until it lowers. Turn latch
(E) until section (A) lowers.
B
A
E
CAUTION
•
To avoid damage, the weight of the I.V. bags should not exceed 40 pounds.
•
To avoid damage while transporting the stretcher, verify that the I.V. pole is at a low enough height to allow it to safely
pass through door openings and under light fixtures.
Return To Table of Contents
1-22
Operation Guide
C
D
Figure 17: I.V. Pole Latch Detail
Figure 16: I.V. Pole
A
E
1079-009-005 REV E
C
B
D
Figure 18: I.V. Pole Grip Detail
www.stryker.com