Installing The Head Extension With Pillow; Positioning The Optional Three-Stage Iv Pole - Stryker M-1 Manual Del Usuario

Ocultar thumbs Ver también para M-1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 169
English
Installing the defibrillator platform (Continued)
EN
Note: If the defibrillator platform is not attached to the product after you connect both latch hooks, unlatch the tab. To
adjust, loosen or tighten the strap and then push the tab up until it locks into place with an audible click.

Installing the head extension with pillow

You can install the head extension assembly on the backrest to provide head end support.
To attach the pillow to the head extension, place the support into the flap on the bottom of the pillow. Secure the pillow
to the Velcro® on the bottom of the support.
Notes
The head extension with pillow (6100-044-000) is not compatible with the optional equipment hook (6500-147-000)
or optional fowler oxygen bottle holder (6500-241-000).
The head extension pillow is a Type BF applied part.

Positioning the optional three-stage IV pole

CAUTION
Do not load the IV pole above the safe working load of 25 lb (11.3 kg).
Note: The dual three-stage IV poles (6500-317-000) are not compatible with either the patient right (6500-315-000) or
the patient left (6500-316-000) three-stage IV pole options.
To position the IV pole
1.
Lift and pivot the IV pole from the storage position and push down until the IV pole locks into the receptacle (A).
2.
To raise the height of the pole, turn the lock actuator (B) counterclockwise and pull up on the telescoping portion (C)
of the pole to raise it to the desired height.
3.
Turn the lock actuator (B) clockwise to lock the telescoping portion in place.
4.
For a higher IV pole, pull up on section (D) until the spring clip (E) connects.
5.
Hang the IV bags on the IV hook (F).
6.
To lower the IV pole, push in on the spring clip (E) and slide section (D) down into section (C). Turn the lock
actuator (B) counterclockwise and slide section (C) into the bottom tube.
7.
Turn the lock actuator (B) clockwise to tighten.
8.
Lift up and pivot the pole down into the storage position.
1-28
Operation
(Figure 1-23 on page
1-29):
6100-109-005 REV B
www.stryker.com

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

6100

Tabla de contenido