Descargar Imprimir esta página

Thermador PH Serie Instrucciones De Instalación página 8

Ocultar thumbs Ver también para PH Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

12. Before hanging hood, install
transition per Figure 6. Fasten
transition with two (2) screws
(#8 x 3/8 sheet metal,
supplied) and tape per all
applicable codes.
Note: Screws
must not hinder
damper operation.
13. Rest the hood on the screws
in the wood bracket. Use the
keyholes labeled "I" in Figure
8. Make sure the wood
bracket fits into the recess on
the back of the hood.
14. Remove knockouts.
15. Tighten the screws in
keyholes. Check hood for level
and adjust if necessary.
16. From inside the hood drive
screws (#8 x 5/8") through
holes in hood into wooden
bracket. See holes labeled Jin
Figure 8
Figure 8.
17. Connect additional ducting.
installation Note:
If wall studs are within 8" of the center line, cut
stud at an angle to avoid any interference.
Assembly and Installation of the Duct Covers
Optional duct covers shown in
Figure 9 may be used to fill the
space between the hood and ceiling
in wall mount installations. 6" and
12" high duct covers are available
and may be ordered separately.
1.
Ifmultiple duct covers are used,
connect the pieces together
using sheetmetal screws
provided with duct covers.
2.
Attach the duct cover(s) to the
hood using sheetmetal screws
as shown in Figure 9.
3.
From inside of hood, insert
screws supplied (#8 x 5/8")
through holes L, one (1) on
each side and four (4) along the
front, into bottom of the
cabinet.
#8 xX 3/8"
Screw
(numbers
depend
on
hood
size)
Figure 9

Publicidad

loading

Este manual también es adecuado para:

Ph30Ph36Ph42Ph48Ph54Ph48cs/01 ... Mostrar todo