Descargar Imprimir esta página

Lifetime 60429 Instrucciones De Ensamblaje página 10

Juego para tiempo inclemente

Publicidad

 SECTION 1 (CONTINUED) / SECTION 1 (SUITE) / SECCIÓN 1 (CONTINUACIÓN)
TOOLS AND HARDWARE REQUIRED / OUTILS ET QUINCAILLERIE REQUIS / INSTRUMENTAL Y HERRAJE REQUERIDOS
BQL
1.5
• Attach a long support channel (HMD) to the end of a truss gutter channel using two (2) self-tapping screws (BRK) as indicated.
Connect the support channel to the wall panel using ten (10) screws (ADZ) through the holes along both sides of the
length of the support channel. Repeat this step for the fi ve (5) support channels on the side walls of the shed. Extra eff ort will be required when
inserting screws (BRK) through the metal.
• Attacher un canal de support long (BRF) à l'extrémité d'un canal de gouttière à l'aide de deux (2) vis autotaraudeuses (BRK)
comme indiqué. Attacher le canal de support au panneau mural à l'aide de dix (10) vis (ADZ) à travers les trous le
long des deux côtés du canal de support. Répéter cette étape pour les cinq (5) canaux de support sur les murs latéraux de l'abri. Un eff ort
additionnel est nécessaire pour percer le métal avec les vis (BRK).
• Sujetar un canal de soporte long (BRF) al extremo de un canalón de armazón usando dos (2) tornillos autoroscantes (BRK) como se
indica. Sujetar el canal de soporte al panel mural usando diez (10) tornillos (ADZ) por los agujeros a lo largo de los dos
lados del canal de soporte. Repetir este paso para los cinco (5) canales de soporte en los muros laterales de la caseta. Se requiere un esfuerzo adicional
para perforar el metal con los tornillos (BRK).
ADZ (x50)
HMD
BRK (x10)
BRK
10
BRK
HMD
ADZ (x10)

Publicidad

loading