Descargar Imprimir esta página

Greencut ASG35000 Manual De Instrucciones página 55

Astilladora

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 2: ATTACH TOW BAR AND BEAM
1.
Connect the tow bar (nº2) to the hydraulic reservoir using the hexagon bolt M12x100 (nº35), the flat washer
Ø12 (nº20) and the lock nut M12 (nº25).
71
50
33
STEP 3: ATTACH ENGINE AND THE OIL PIPE
1.
Attach the motor (nº11) to the motor (nº12) with the polyurethane block (nº12) and the large flat washer
Ø10 (nº58), the hexagon bolt M10x75 (nº36), the flat washer Ø10 (nº22), the lock washer Ø10 (nº92), the
nylon lock nut M10 (nº55).
2.
Attach the clear oil pipe (nº43) to the oil inlet connector of the gear pump, positioning it by means of the
clamp (nº44).
3.
Connect the high pressure oil pipe (nº39) to the gear pump oil outlet fitting, sealing it with O-ring Ø 14x2.4
(nº32).
NOTE: Tighten the oil line connector between the 80-90 N-m torque control.
42
35
20 25
2
39
2.
Attach the towbar to the beam using the towbar hitch
pin (nº50) and pin R (nº71).
3.
Attach the hydraulic hose (nº42) to the hydraulic tank
connector, sealing with the O-ring 17x2.5 (nº33). Before
assembly, apply a small amount of butter to the O-ring.
44
43
36
32
55 22 92
58
12
55
EN
11

Publicidad

loading