Descargar Imprimir esta página

Hilti SIW 6 AT-A22 Manual De Instrucciones Original página 13

Ocultar thumbs Ver también para SIW 6 AT-A22:

Publicidad

Idiomas disponibles

Idiomas disponibles

Torque adjustment
Large standard bolts
Large high-strength bolts
Chuck
Storage temperature
Ambient temperature for opera-
tion
4.2 Battery
Battery operating voltage
Ambient temperature for opera-
tion
Storage temperature
Battery charging starting temper-
ature
5
Operation
5.1 Preparations at the workplace
WARNING
Risk of injury by inadvertent starting!
▶ Before inserting the battery, make sure that the product is switched off.
▶ Remove the battery before making any adjustments to the power tool or
before changing accessories.
Observe the safety instructions and warnings in this documentation and on
the product.
5.1.1 Charging the battery
1. Before charging the battery, read the operating instructions for the
charger.
2. Make sure that the contacts on the battery and the contacts on the
charger are clean and dry.
3. Use an approved charger to charge the battery. → page 8
*2124662*
Three settings (additional settings
are possible when using the intelli-
gent torque module SI­AT­22 and
the torque display shows "AT")
M8 to M16
M6 to M12
/
1
retention
−4.0 ℉ ... 158.0 ℉
(−20 ℃ ... 70 ℃)
1.4 ℉ ... 140.0 ℉
(−17 ℃ ... 60 ℃)
21.6 V
1.4 ℉ ... 140.0 ℉
(−17 ℃ ... 60 ℃)
−4.0 ℉ ... 104.0 ℉
(−20 ℃ ... 40 ℃)
14.0 ℉ ... 113.0 ℉
(−10 ℃ ... 45 ℃)
2124662
" square drive with ball-notch
2
English
9

Publicidad

loading