Descargar Imprimir esta página

lifter EY15L Manual De Uso Y Mantenimiento página 77

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 190
FIRST TIME SETUP
INSTALL THE TILLER HANDLE
1. Handle numbers correspond to chassis numbers.
2. Disconnect the battery.
3. Remove handle shaft (item 2) from Handle socket.
4. Put the chassis connector through wire supporting plate (item 5) and lock hole.
5. Install handle assembly (item 1) to handle socket. Be careful to avoid damaging
the wire harness.
6. Install handle shaft through the handle assembly ad handle socket. Install
spring pin (item 3) to left side of handle shaft.
7. Press down on the handle assembly and remove spring holder (item 4).
8. Connect and lock the wire harness from handle assembly to chassis connector.
9. Fix wire harness to wire holder (item 6).
10. Reconnect the battery.
Maintenance / Battery
Maintenance / Battery
Use and maintenance manual - EN77
EN

Publicidad

loading

Productos relacionados para lifter EY15L

Este manual también es adecuado para:

Ey20l