5
1
a
5
Engage the rollers using the provided lever. The drive rollers
must now be applied at both sides. Also check the opposite
side. Disengage drive rollers again.
Repeat this procedure at the opposite side.
Installation of motor cables and control unit
The maneuvering assistant is only suitable for connection to
12 V batteries (DC voltage)!
Remove battery cable terminals and disconnect any ex-
ternal electrical power before starting work. If you are
unsure about the electrical installation, have it checked out by
a qualified Auto Electrician.
The electrical installation must comply with the technical and
administrative provisions of the respective country in which it
is used (e.g. EN 1648-1). National regulations and guidelines
must be observed.
Pre-fitted, each motor has two heavy-duty cables (6 mm²).
Mark the respective motor connecting cables (motor A or B –
see also wiring diagram) and temporarily route to the intended
control unit installation position on the underbody of the cara-
van. An example of a suitable location for the control unit is in
a bed stowage box in close proximity to the manoeuvring sys-
tem, at least 40 cm away from the battery.
Insert control unit into stowage box and secure with the sup-
plied chipboard screws (5 x 16).
Drill a 25 Ø hole on the floor of the caravan for leading the cables
through, approx. 150 mm from the control unit terminal strip.
Take care to avoid any chassis members, gas pipes and
electrical wires!
Drill hole and lead cables through floor of caravan to control
unit in such a way that they cannot chafe (particularly when
leading through metal panels). This can be done using protec-
tive tubes, which will prevent the cables from being damaged.
The drive motors move during operation. To compen-
sate for this, the cables should be secured loosely with a
little play in this area in order to prevent cable stretching. No
cables must be routed over the control unit!
Secure cables to chassis and / or underbody using the sup-
plied clips and screws.
Seal hole in vehicle underbody using plastic body sealant.
18
4
2
3
Maneuvering assistant RH1
Connecting diagram
Installation in
front of axle
Top-down
view
B
A
Installation
behind axle
Top-down
view
A
B
Connecting the drive motors
Ensure the battery used to operate the Mover is fully charged.
Cut motor cable of drive motor that is furthest away from con-
trol unit to length. Shorten the motor cable of the nearest drive
motor to the same length. The two drive motor cables must
be of the same length to ensure that the drive output of the
maneuvering assistant is uniform! Excess cable must be routed
in wavy lines without looping.
Crimp the provided flat plugs onto the drive motor cables. Re-
lease flap at control unit terminal strip by pressing and connect
cables as shown in wiring diagram (red = positive,
black = negative). Please ensure that the connections are
made properly!
Drive
Drive
motor
motor
Battery
–
+
4
3
2
+
–
+
A
-
+
Drive
Drive
motor
motor
Battery
–
+
4
3
2
–
+
–
B
-
+
1
–
B
1
+
A