Operation
8.6.1 Recovery phase
1. Enter the preferred settings and press ENTER to confirm.
2. If "Rec/Recycling phase" has been selected, enter the preferred wait-
ing time for the pressure increase (standard is 1 min.) in the following
menu and press ENTER to confirm, otherwise continue with "Vacuum
process".
NOTE
I
The waiting time ensures that any residual refrigerant vaporises and can
then be extracted. The vaporising residual refrigerant triggers an increase in
pressure.
8.6.2 Vacuum process
1. Enter the preferred settings and press ENTER to confirm.
2. If "Vacuum phase" has been selected, enter the preferred vacuum
time (standard is 20min.), otherwise continue with "Filling process".
3. Use the cursor key
4. Press ENTER to confirm both settings.
NOTE
I
The air conditioning system is drained completely by the vacuum pump. This
is used to remove any remaining carrier gases or moisture, and to prepare
the air conditioning system for the filling process. Any residual refrigerant ex-
tracted which is still bonded in the refrigerant oil is collected by the
AirConServiceCenter and recycled.
100
LP
phase?
ENTER-OK STOP-EXIT
Pressure increase
Test time
min.
ENTER-OK STOP-EXIT
Vacuum phase
ENTER-OK STOP-EXIT
to enter the vacuum phase time.
Vacuum time
min.
Vacuum test time
min.
ENTER-OK STOP-EXIT
AirConServiceCenter
Yes
No
1
Yes
No
30
4
EN