Programming And Startup; Connection To The Power Supply And Checking Of Turning Direction; Controls And Commands - Erreka PUMA Manual Del Instalador

Accionador para puertas corredera
Ocultar thumbs Ver también para PUMA:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

PROGRAMMING AND STARTUP

1

CONNECTION TO THE POWER SUPPLY AND CHECKING OF TURNING DIRECTION

The correct operation of the operator and of the
complete system will only be achieved after
programming. However, prior to programming, it is
necessary to carry out the checks listed below.
Before carrying out any gate movement,
ensure there is no person or object in the radius
of action of the gate and the drive mechanisms.
Limit switches configuration (DIP9)
2

CONTROLS AND COMMANDS

SW1
Main switch
SW2
Programming DIPs
MARCHA
Total start mini-pushbutton
PEATONAL Pedestrian start mini-pushbutton
(start)
(pedestrian)
1 Connect the control panel power supply.
2 Check the turning direction of the operator using
the mini-pushbuttons PUL1 (close) and PUL2 (open).
If the turning direction of the operator is not
correct, interchange the connection cables (black
cables) in their corresponding connector (see
"Electrical connections" on page 39).
The limit switches must be configured in accordance
with the operator assembly position with regards to the
leaf:
• When the gate opens to the right (detail A), place
DIP9 in ON.
• When it opens to the left (detail B), place DIP9 in
OFF.
Proceed as follows to check the configuration:
• Place a magnet on FCC: DL6 should come on.
• Place a magnet on FCA: DL7 should come on.
CERRAR
Close mini-pushbutton
ABRIR
Open mini-pushbutton
T.ESPERA Standby time regulation (0-90 seconds)
(only functional in automatic mode)
R.PAR
Torque adjustment
English
(close)
(open)
(Standby)
( T o r q u e
adjustment)
PUMA operator for sliding gates
41

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Puma pus400ecPuma pus400ecm

Tabla de contenido