en
Switching on the steady leg system
During operation, also observe the operating instructions of the HY4 levelling support system.
CAUTION!
Danger of tipping over!
The trailer may not be attached when using the supporting system.
1. Check the system for damage before commis-
sioning!
2. Press the "ON/OFF" (2) button on the manual
operating device of the levelling support sys-
tem for at least four seconds.
✓ All control LEDs light up briefly.
✓ If the levelling support system is active and
operational, the "ON/OFF" control LED lights
up (1) continually green.
✓ Die control LEDs (3) to (6) light up permanently
green.
Connection to 2LINK Box
If necessary, perform the "Initial commissioning" steps
Only one connection to a smartphone is possible at once.
Precondition:
HY4 levelling support system must be switched on
1. Start the 2LINK App.
2. Press the "2LINK connection" (1) control panel.
3. Select the 2LINK Box.
26
6
5
("Initial
commissioning")!
("Switching on the steady leg
1
1
2
3
4
system").
1808647_a