Descargar Imprimir esta página

Harbor Breeze LANDON LAN52WW5LD Manual Del Usuario página 8

Ventilador de techo

Publicidad

Idiomas disponibles

Idiomas disponibles

INITIAL INSTALLATION
5A.
Remove pin (J) and clip (K) from downrod (A).
5B.
Partially loosen preassembled set screws and nut
in motor housing yoke at top of motor housing (D).
6. Insert downrod (A) through canopy (B), canopy
cover (N) and yoke cover (O). NOTE: Canopy
cover (N) must be turned with the smooth side
toward the motor housing (D).
Then, thread wires from motor housing (D)
through downrod (A).
7. Slip downrod (A) into motor housing yoke, align
holes and re-install pin (J) and clip (K). Tighten
set screws in motor housing yoke and then tighten
preassembled nut on one of the set screws. Then,
slide yoke cover (O) down until it rests on top of
motor housing (D).
5A
K
D
6
B
7
K
K
D
8
5B
A
J
Set Screw
Yoke
A
N
O
A
O
J
Set Screw
and Nut
J
Yoke

Publicidad

loading

Este manual también es adecuado para:

5407125