Descargar Imprimir esta página

Balluff BNI XG1-505-0A5-K083 Manual De Instrucciones página 31

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 69
BNI XG1-505-0A5-K08 _
Network interface
6
Startup and operation
6.1
Startup
DANGER
Uncontrolled system movement
When starting up, if the network module is part of a
closed loop system whose parameters have not yet been
set, the system may perform uncontrolled movements.
This could result in personal injury and equipment
damage.
► Persons must keep away from the system's
hazardous zones.
► Startup must be performed only by trained technical
personnel.
► Observe the safety instructions of the equipment or
system manufacturer.
1. Check connections for tightness and correct polarity.
2. Turn on the system.
Check for the correct values, especially after
replacing the BNI or after repair by the
manufacturer.
6.2
Operation
Operating notes
Regularly check function of the BNI and all associated
components.
Take the BNI IO-Link master out of service whenever
there is a malfunction.
Secure the system against unauthorized use.
Check fasteners and retighten if needed.
www.balluff.com
6.3
Cleaning
The product may only be cleaned when switched off.
6.4
Maintenance
The product is maintenance-free.
Depending on the operating conditions, it may be
necessary to regularly check and, if necessary, retighten
the tightening torques of the plugs and caps to maintain
the protection classes (see chapter 5.2 on page 11).
english
13

Publicidad

loading

Este manual también es adecuado para:

Bni xg1-505-0a5-k084