1
a
c
7. Fasten:
• Plastic tie 1
NOTE:
Route the wiring harness a by winding them
b
under and over the shift cable b and the throt-
tle cable c.
8. Install:
• Shift cable 1
• Throttle cable 2
• Cable clamp 3
• Bolt 4
• Hose locating plate 5 (F80B, F100D)
• Hose locating plate 6 (F115A)
• Bolt 7
• Fitting plate 8
• Bolts 9
175
Bolt:
8.0 N • m (0.82 kgf • m, 5.9 ft • lb)
E