Electrical Circuit Diagram - Nussbaum POWER LIFT HL 2.50 NT Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

15

Electrical circuit diagram

Object:
System:
Customer:
Circuit diagram number: 2.xx HL NT CE 03/15/007
Grounding according to local regulations
Before commissioning check whether the nominal
motor current matches the motor protection relay.
Check all terminal points for proper connection
and that all contact screws are tight.
Before commissioning, check all wiring and con-
trols for proper function. Do not permit commis-
sioning from the unauthorized side.
These plans were generated on a CAD system. To
keep plans to the current state, we ask that you
request Nussbaum to make the changes.
These circuit diagrams are intellectual property.
They may not be given to third parties or repro-
duced without our permission!
Rights to make changes are retained.
Circuit diagram and switch documents
Circuit diagrams were made to the best of our
knowledge.
No guarantee is made for the accuracy of en-
closed circuit diagrams and switch plans con-
tained in this document. This is particularly relevant
for switches that were completed by us according
to third party plans. This was done by us from pur-
chaser provided manufacturer documentation.
Functional test of switch systems
Circuit diagrams are not standard documents.
When checking the control cabinet at the fac-
tory, field devices such as sensors, thermostats and
motors cannot be included. For this reason, even
with careful inspection, functional and switch er-
rors cannot always be prevented.
Deficiencies are removed within the scope of
guarantee during commissioning. During commis-
sioning, if our services are not used, then no defi-
ciency liability is accepted. Rework, including in-
forming of circuit diagrams of switch systems not
commissioned by us are therefore only done to an
invoice according to our service terms and condi-
tions. Costs for rework by third parties cannot be
hounored.
20110002 POWER LIFT HL 2.50 NT - HYMAX HL 5000 PH OPI
2.xx HL NT CE 3x400/230 V
Version 1.0
Safety inspection and safety measures
The control cabinet has been produced, set up
and inspected according to recognized technol-
ogy rules according to VDE0100/0113 and acci-
dent prevention regulation VBG4 (electrical sys-
tems and equipment)
The following tests were done:
- Voltage test and/or insulation test of the control
cabinet according to VDE0100/5.73
- Inspection of effectiveness of the safety mea-
sures used for indirect contact according to
VDE0100g/7.75 para.22
- Functional test and part test according to
VDE560/11.87
Implemented safety measures:
- Protection against direct contact according to
VDE0100/5.73. para.4
- Protection against indirect contact according to
VDE0100/5.73. para.5
217

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Hymax hl 5000 ph

Tabla de contenido