Erreka TOPO Manual Del Instalador página 60

Accionador electromecánico soterrado para puertas batientes
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
Position the upper hinge and the gate
Connect the operator to the control board VIVO-D201(M)
Before carrying out any gate movement, ensure there is no person or object in the radius of
action of the gate and the drive mechanisms.
See the control board instructions manual for further information.
GND
SNG1
V+
V+
Brown cable
(encoder power
supply)
GND Mesh
(encoder mass)
SNG1 Green cable
(encoder signal 1)
• Use C0 to select the number of operators: (C001: one operator, C002: two operators).
• Programme the parameter C7 for operation with encoder: C701.
• Programme the parameter C3 for the operator model (TOPO: C302).
• Check turning direction by connecting the power supply (SW1 = ON). The operators close the gate
(reset). If the gate opens instead of closing, change the turning directions (C101 or C102 for A1 and
C201 or C202 for A2).
56
Installation manual
ST2
ST1
ENCODER1
ENCODER2
-FT
AUX
(Test)
24 Vdc
P13 P14 P15 P16 P17 P18 P19 P20 P21 P22 P23
P1 P2 P3
P4 P5 P6
P7 P8
P9 P10
1 Attach the gate (1) on the upper hinge (2) and
support it on the upper driven arm (3).
Control the alignment of the upper hinge (2) and
the operator pivot.
Control the verticality of the gate.
2 Weld the gate (1) to the upper driven arm (3).
3 Move the gate throughout its travel, checking it
moves smoothly, without any contact or stiffness.
Should manual operation be difficult, solve
the problem before proceeding with the
installation.
4 Apply anti-corrosion protection in the un-painted
areas.
P24 P25
MOTOR2
G4 G5
G6
MOTOR1
P11 P12
G1 G2
G3
G1/G4 Red cable
G2/G5 Blue cable
SW1
ON
OFF
G7 G8
G9 G10
N
L
POWER - 230V
VIVO-D201:
VIVO-D201M:
P02Y

Publicidad

Tabla de contenido
loading

Tabla de contenido