• Rotate blower 90 degrees and reinstall (2)
screws (Fig.17). Reinstall blower box covers,
damper and screws.
2. Adjust height of the telescoping support
frame and secure with screws and washers.
Fig.18.
!
CAUTION: Adjust the height before
installation.
3. Lift range hood into the ceiling opening.
4. Secure each support frame to the wooden
hood support frame using (6) 6 x 60 mm lag
bolts and washers provided. Fig. 19.
5. Install exterior or in-line blower by following
instructions provided with blower.
6. Install ductwork and duct tape all joints to
ensure an air tight seal.
2x4 WOOD
FRAME
- 14 -
FIG.17
FIG.18
(6) WASHERS
& LAG BOLTS
FIG.19