Preparation Before Operation - Hitachi C 12FSA Manual De Instrucciones E Instrucciones De Seguridad

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION BEFORE OPERATION

Make the following preparations before operating the power tool:
1. Installation
7/16" (11mm)
2 Holes
17-21/64" (440mm)
Attach the power tool to a level, horizontal work bench in accordance with Fig. 4.
Select 13/32" (10mm) diameter bolts suitable in length for the thickness of the work bench.
Bolt length should be at least 1" (25mm) plus the thickness of the work bench.
For example, use 2-23/64" (60mm) or larger bolts for a 1" (25mm) thick work bench.
The holder (B) attached to the rear of the base helps stabilize the power tool.
Holder (B)
Adjust the holder
(B) until its bottom
surface contacts the
work bench surface.
Fig. 5
2. Releasing the locking pin
Fig. 6
3. Installing the dust bag, holder, stopper and vises
(The holder and stopper are optional accessories.)
Attach the dust bag, holder, stopper and vise assembly as indicated in Fig. 1.
Holder (B) adjustment:
Loosen the 6mm bolt with the supplied 10mm × 13mm wrench.
Adjust the holder (B) until its bottom surface contacts the work
bench surface.
After adjustment, firmly tighten the 6mm bolt.
Move
6mm Bolt
When the power tool is prepared for shipping, its main parts are
secured by a locking pin.
Locking Pin
Move the handle (see Fig. 1) slightly so that the locking pin can be
disengaged.
NOTE:
Base
13/32" (10mm) Bolt
Work Bench
Fig. 4
Lowering the handle (see Fig. 1) slightly will enable you
to disengage the locking pin more easily and safely.
The lock position of the locking pin is for carrying and
storage only.
13/32" (10mm) Nut
English
11

Publicidad

Tabla de contenido
loading

Tabla de contenido