Battery Charging; Important; Installation And Start-Up - Promax PROLINK-4C Manual De Instrucciones

Medidor de nivel tv digital & satavanzado con pantalla color
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3.1.2.1

Battery Charging

To fully charge the battery, connect the instrument to the external DC charger
without pressing the on/off key
depends on the condition of the battery. If they are very low the recharging period is
about 4 hours. The CHARGER [7] indicator should remain lit in amber colour.
When the battery charging process is completed with the instrument off, the fan
stops.
The instrument battery needs to be kept charged between 30% and 50% of its capacity
when not in use. The battery needs to be fully charged for best results. A fully charged
battery suffers temperature-related discharge. For example, at a room temperature of
20ºC, it can lose up to 10% of its charge over 12 months.
3.2

Installation and Start-up

The PROLINK-4C level meter is designed for use as a portable device.
When the
mode; that is, the device is automatically disconnected fifteen minutes after the last time
a key has been pressed. When turning on the unit, automatic power-off mode may be
deactivated by holding down the
later "MANUAL POWER" message will appear on the lower side of the monitor. When
the device is operating, it is also possible to select the manual power-off mode by
means of the Manual power function of the TV functions menu.
Page 16
[1]. The length of time it takes to recharge it
[1] key is pressed, the instrument is in the automatic power-off
[1] key until you hear two acoustic indications,
USER'S MANUAL. PROLINK-4C

IMPORTANT

02/2003

Publicidad

Tabla de contenido
loading

Tabla de contenido