Power Connections - PRO LIFTS VMB ShowLift AED-SL18 Manual De Instrucciones

Torre show electrónica
Tabla de contenido

Publicidad

Quick operation guide
6. - SHOWLIFT ASSEMBLY
6.1 - Place the lift in its working position,
on a firm, flat surface making use of the
transport wheels.
6.2 - Remove the legs from their transport
compartments by unlocking the trigger,
and fully insert them into their working
positions checking that they are fixed with
the locks.
ATTENTION:
THE LEGS HAVE SENSORS, SO IF THEY
ARE NOT PLACED IN THEIR WORKING
POSITION THE LIFT WILL NOT WORK.
WORKING
POSITION
HOLE
6.3 - Check that the lift is in a vertical po-
sition using the spirit level at the base of
the tower, adjust the stabilizer, turning the
handle if necesary.
6.4 - Place the load on the top platform
or tray, center and fix it firmly to the co-
rresponding holes. Secure the load with
straps, binding them at the edges of the
tray. THE MAXIMUM LOAD IS 55 Kg
(121 lb). The lift should NEVER be over-
PRO LIFTS S.L.
STOP PIECE FOR
WORKING POSITION
Depósito legal y copyright 2018. Todos los derechos reservados.
ENGLISH
loaded (over 55 Kg). Safety at work is the
most important issue.

6.5 - Power connections:

Wire the power lines and power distribu-
tion. Each Showlift has separate true1
power connectors. On the main panel, be-
low the display are the connections for the
functioning of the towerlift itself, and on
the top load connection panel, completely
independent, are the power connections
for the equipment that would be mounted
on the top tray.
Patch panel for the Showlift:
DISPLAY
CONTROL
BUTTONS
EMERGENCY
STOP
DMX SIGNAL
DEAD MAN
SWITCH
POWER
7

Publicidad

Tabla de contenido
loading

Tabla de contenido