Prepare the Site

2x6 Backing Material
Matériau de renfort 2x6
Material de refuerzo de 2x6
NOTICE: If the K-2607 bridge cabinet will also be installed, extend the backing
material a minimum of 12" (30.5 cm) beyond the width of the vanity on the side
where the bridge will be installed.
NOTICE: To properly secure the vanity, the top of the required 2x6 backing material
must be 32-1/2" (82.6 cm) from the finished floor.
Measure and mark 32-1/2" (82.6 cm) up from the finished floor. This will be the
height from the finished floor to the top of the 2x6 backing material.
Ensure there are no obstructions in the wall (such as wiring or plumbing) from
the marked height down to the floor. If there are obstructions, select another area
within the site to install the vanity.
NOTICE: Extend the backing material beyond the width of the vanity to the nearest
stud. This will ensure proper support for the vanity.
Front-notch the studs 1-1/2" (3.8 cm) to ensure the 2x6 backing material is flush
against the studs.
Secure the 2x6 backing material to the studs with framing nails.
Rough-in the water supply and drain lines into the rough-in plumbing area of the
vanity.
NOTICE: To avoid the risk of product damage, the finished wall must be straight and
plumb. If the finished wall is not straight and plumb, the vanity will not be properly
supported and will cause misalignment of the lavatory and door.
Complete the finished wall. Make sure the finished wall is straight and plumb,
and the floor is flat and perpendicular to the finished wall.
Préparer le site
NOTICE: Si le meuble traverse K-2607 est également installé, prolonger le matériau
de renfort de 12" (30,5 cm) minimum au-delà de la largeur du meuble sur le côté ou
la traverse sera installée.
1147372-2-B
32-1/2" (83.6 cm)
4
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido