2.2. SP quick d (2 ea. SP quick pump heads arranged in
series) (figs. 24,23,22)
Limited to PD 5001, PD 5101 and PD 5201 pump drives.
SP quick pump head with one more SP
-
quick pump head allows to run 2 ea. feeder
channels the same time.
Unscrew 2 ea. knurled head bolts (6 fig. 23)
-
from SP quick pump head (3) with about 10
revolutions CCW. Replace with long
knurled head bolts (7).
Beware short knurled head bolts (6 fig. 23)
-
for future use.
Fit SP quick d pump head (8), with spacer
-
(42) over threaded end of long knurled
head bolts (7), seat long knurled head
bolts and secure by turning clockwise;
press two ea. pump heads (3 & 8)
together. SP quick (3) properly needs to
be caught by the SP quick d (8)
counterpiece. As required, rotate rotor by
hand (to this end open hose bed, refer to
Chapter 3.3) Secure pump pack on pump
drive as described in Chapter 2.1.
2.3. SP Standard, SP vario, (fig 25)
Installation of SP Standard and SP vario
-
pump heads needs flange (9) from your
hardware kit.
Uninstall flange (9) from pump head (3) by loosening setscrew (10).
-
Secure flange on front panel with countersunk screws (11). Use Phillips screwdriver.
-
Introduce SP Standard or SP vario pump head into flange (coupling pointing forward).
-
Make sure that coupling fits counterpiece (as required, rotate rotor a little bit; remove cover to
-
get access (also refer to Chapter 3.5)). Check horizontal location of pump head (3); hose
outlet pointing to the left; secure in place with setscrew (10).
42
8
10
11
9
47
6
fig. 23
7
3
fig. 24
3
fig. 25
IEI