PRO LIFTS VMB HDT-8 Manual De Instrucciones página 9

Torre elevadora
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

O R I G I N A L
4. USER INSTRUCTIONS.
4.1 -
in the area it is to be used with the help of
the transport wheels (T).
4.2 -
the transport compartment (S) and remo-
ve the legs (P) and fully insert them into
4.3 -
tion using the spirit level (L) at the base of
the tower, adjust the stabilizer (Q), turning
the handle (H) if necesary.
4.4 -
4.5 - DO NOT OVERLOAD THE LIFT.
MAXIMUM LOAD IS 350 kg (772 lb)
The lift should NEVER be overloaded.
sue. Place the load onto the lift using an
adequate VMB support according to the
need, use so that the weight of the load
will only be elevated in a vertical direction.
The minimum load is 25 Kg.
PRO LIFTS S.L.
3.17 - Only original replacement parts should be used.
RS) of
V
RV).
-
F) and place them
-
Depósito legal y copyright. Todos los derechos reservados.
ENGLISH
4.6 - How to place the load:
Always load as close to the tower as
possible. The maximum load diminishes
according to the distance from the body
of the tower as illustrated in the diagram
4.6.1, which shows the load on the gravity
centre with distances to the lifting carriage
at a maximum lifting. Use a VMB adaptor
if necessary.
CAUTION
When two towers are used to elevate a
truss bridge, or many towers to elevate a
structure of any type, it is almost impos-
sible that two or more people co-ordinate
the winches elevating or lowering the
loads, at exactly the same pace. At a cer-
tain point each tower will be extended to
different height. For this reason it is ne-
cessary that the structure does not stretch
and allows for these differences.
from the handle of the winch will deform
the structure and apply a lateral force to
-
9

Publicidad

Tabla de contenido
loading

Tabla de contenido