Preparing Maintenance Work; Finishing Maintenance Work - Dometic TEC 29 EV Instrucciones De Uso

Ocultar thumbs Ver también para TEC 29 EV:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 84
TEC29 EV, TEC29 EV LPG
10.2

Preparing maintenance work

!
CAUTION!
Note the following for all maintenance work:
• The generator must not be running.
• All the parts must be cooled down.
➤ Switch the generator to no function with the main switch (fig. 4 1, page 5).
➤ Disconnect the positive terminal of the supply battery.
➤ Open the generator front door.
For maintenance work, you can take the generator out (fig. 5, page 5):
!
WARNING!
The mounting plate with generator is very heavy (> 40 kg) and could fall
out the housing if you take it out too far.
➤ Undo the fastening screws (1).
➤ Remove the mounting plate (2) with the generator from the housing (3).
10.3

Finishing maintenance work

➤ Connect the generator to the positive terminal of the supply battery.
➤ Switch the generator to standby with the main switch (fig. 4 1, page 5).
➤ Close the generator front door.
EN
Servicing the generator
25

Hide quick links:

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Tec 29 ev lpg

Tabla de contenido