Preparing The Installation - Waeco CoolBreeze CB-1200-AC Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 80
IA_CB-1200.book Seite 40 Montag, 18. April 2005 4:15 16
Installing the fresh air cooling system
Improper installation of the fresh air cooling system can result in
irreparable damage to the device and put the safety of the user at risk.
WAECO assumes no liability for malfunctions and for the safety of the
fresh air cooling system, especially for personal injury and/or damage to
property, if the fresh air cooling system is not installed in accordance with
these installation instructions.
The following power supplies of the vehicle should be disconnected before
installing the fresh air cooling system:
Positive terminal of the battery (for the CB-1200-AC/DC and CB-WT 10)
External power supply (for the CB-1200-AC/DC also the power supply
of the inverter)
Non-observance of this regulation can result in danger of electrocution.
Check whether the roof of the vehicle is able to support the weight of a
person before climbing onto it. Ask the vehicle manufacturer about the
permitted roof loads.
6.2

Preparing the installation

There are two options available for installing the air conditioner:
Installation in an opening to be created (see the chapter "Making a new
opening", page 40). In this case the opening must be reinforced by an
appropriate frame.
Using an existing opening sunroof opening (ventilation hatch) (see the
chapter "Installation in an existing sunroof opening" on page 41).
Making a new opening (4 , 5 and 6 , page 4)
Drill the corner points prior to sawing!
Insert a reinforcement frame made of wood strips.
Wear safety glasses and protective gloves when using electrical tools or
hand saws.
40
All manuals and user guides at all-guides.com
CB-1200

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Coolbreeze cb-1200-ac/dc

Tabla de contenido