Initial Start-Up (No Load) - Rheem GEN12AD-V Manual De Instalación

Ocultar thumbs Ver también para GEN12AD-V:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Battery
WARNING Battery posts, terminals and related
accessories contain lead and lead compounds, chemicals
known to the State of California to cause cancer and
reproductive harm. Wash hands after handling.
The installer must supply and install a sealed, valve-
regulated, lead-acid rechargeable starting battery. The
starting battery MUST conform to the specifications shown
below in the chart.
Battery Specifications
Volts
12 Volt DC
Amps (MIN)
600 CCA (cold cranking amps)
Type
AGM (Absorbed glass mat)
Terminal Hardware
M6
Dimensions (MAX):
Width
5.5 inches (140mm)
Length
9.0 inches (230mm)
Height
8.25 inches (210mm)
WARNING Storage batteries give off explosive
hydrogen gas during recharging.
Slightest spark will ignite hydrogen
and cause explosion, resulting
in death, serious injury and/or
property damage.
Battery electrolyte fluid contains acid and is
extremely caustic.
Contact with battery contents could cause severe
chemical burns.
A battery presents a risk of electrical shock and high short
circuit current.
DO NOT dispose of battery in a fire. Recycle battery.
ry in a fire
ry in a fire.
DO NOT allow any open flame, spark, heat, or lit cigarette
during and for several minutes after charging a battery.
DO NOT open or mutilate the battery.
Wear protective goggles, rubber apron, rubber boots and
rubber gloves.
Remove watches, rings, or other metal objects.
Use tools having insulated handles.
Install the battery as described in Servicing the Battery in the
Maintenance section of the Operator's Manual.
26
cause se
cause
ctrical sh
ctrical shock
d hi
d h
cycle battery
cycle battery
e s
e
rk, heat, or lit
k, heat, or lit
garette
garette
ter charging
ter charging
battery.
battery.
ry ry
ubber boots
ubber boots
ts ts
Use the supplied tie-down strap (A) to secure the battery to
the unit. One end of strap should be attached to the platform
and the other end to the slot that is cut in the back wall of
the unit.
NOTICE Be sure the battery terminals do not contact the
ttery termin
tery termin
back wall as this may cause a short.
y cause a sh
cause a s

Initial Start-up (No Load)

-up (No Lo
up (No Lo
Unit has been set-up for NG operation at the factory.
een set-up fo
en set-up f
Fuel conversion, if needed, must be completed prior to
nversion, if n
version, if
performing these steps. See Fuel Conversion later in
orming these
rming these
this section.
is section.
s section.
Before o
Before ope
Before operating the generator or placing it into service,
inspect the entire installation carefully. Then begin testing the
inspect
spect
syst
syst
system without any electrical loads connected, as follows:
1. Remove four screws (B) that secure control box front
to enclosure to expose unit's circuit breaker.
2. Connect an accurate frequency meter to line side of
generator's main circuit breaker.
B
B
3. Set generator's main circuit breaker to ON
(closed) position.
4. Set generator's system switch to OFF.
A
B
B

Publicidad

Tabla de contenido
loading

Tabla de contenido