Installation Checklist
This generator has been installed per the manufacturer's
instructions:
Installing Contractor Signature: ____________________________
Date: _________________________________________________
Carbon Monoxide (CO) Detector/Smoke Detector
Carbon Monoxide (CO) detector(s) installed and in
working order.
Smoke detector(s) installed and in working order.
Placement
Required permits have been obtained.
Generator placed in a Carbon Monoxide (CO) safe zone.
See Placement of Standby Generator to Reduce the Risk
of Carbon Monoxide Poisoning.
Generator placed in a fire safe zone. See Placement of
Standby Generator to Reduce the Risk of Fire.
Generator placed in a water damage safe zone. See Other
General Location Guidelines.
Generator placed in a utility safe zone. See Other General
Location Guidelines.
Generator placed in a debris free zone. See Other General
Location Guidelines.
Generator placed on flat ground with provisions for water
drainage.See Other General Location Guidelines.
Fuel
Generator is connected to fuel source with flexible fuel
line, has no fuel leaks and conforms to local codes. See
The Gaseous Fuel System.
Proper fuel pressure has been measured with all gas
appliances operating. See The Gaseous Fuel System.
Fuel system has been configured for the proper fuel
supply: Natural gas (NG) or liquefied petroleum ( LP). See
G) or liquefied
Fuel Conversion.
Fuel type: (circle one)
See NFPA 54.
Fuel pressure at fuel inlet port with generator on and at
full load and all gas appliances turned on and operating
____________________.
Electrical
Generator neutral is connected to Automatic Transfer
Switch. See Generator AC Connection System.
Generator is grounded. See Grounding the Generator and
NFPA 70.
Generator is connected to the transfer switch with the
specified wiring. See Utility Circuit Connection and
Transfer Switch Communication.
Generator is connected to the transfer switch with the
specified wiring. #18AWG twisted pair wiring from the
generator control panel to the transfer switch is installed
in a separate conduit from high voltage wires unless
the insulation rating on all wiring is rated for 600V See
Transfer Switch Communication.
Dipswitches in most transfer switches must be set to
correspond to the wattage of the generator. See Transfer
Switch Operator/Installation Manual.
measu
measured
e Gaseous
e Gaseous Fu
nfigured for
nfigured for th
oper
ope
or liquefied
troleum ( L
roleum ( L
e
NG
NG
NG
LP
P P
erator on and a
rator on and
on and opera
on and opera
Operation
Cold weather kit is installed in temperatures below
40°F (5°C). See Cold Weather Kit.
Correct battery type is installed and fully charged. See
Final Installation Considerations.
Generator engine oil level is at full mark. See Final
Installation Considerations.
Circuit breaker is in the ON position.
Utility was shut off to test the operation of generator
and transfer switch. Note any fault codes and make
corrections as required.
AC Voltage Output___________________________.
Frequency Output___________________________.
Owner Information
Name: _______________________________________
Address: ______________________________________
_____________________________________________
___ __
Phone/e-mail: __________________________________
_________
______
Unit Information
n n
Generator Model: _______________________________
odel:
del: ____
__
Generator Serial Number: ________________________
tor Serial Nu
or Serial
Installing Contractor Information
Installing C
Installing C
Name:
Name: _______________________________________
Name:
Ad
Address: ______________________________________
Ad
_____________________________________________
Phone/FAX: ___________________________________
Electrician: ___________________________________
Signature: ____________________________________
Plumber: _____________________________________
Signature: ____________________________________
Inspector Information
Name: _______________________________________
Address: ______________________________________
_____________________________________________
Title: _________________________________________
Inspection Date: ________________________________
9