Nussbaum POWER LIFT HF 3S 3000 Instrucciones De Servicio página 95

Ocultar thumbs Ver también para POWER LIFT HF 3S 3000:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3. Set to the desired height (from 100 mm to 900
mm in 100 mm steps) depending on the ceiling
height.
4. Fasten the extension using the long screws after
the tensioning plate (A) has been placed.
A
5. Fasten the cover.
6. Remove existing hydraulic lines. Do not remove
colour markings.
7. Loosen and turn the T-piece and bracket visible
in the figure.
OPI-POWER LIFT HF 3S 3000-4000 - HYMAX HF 3S 3000-4000 -V1.1-DE-EN-FR-ES-IT
Exchange the supplied hydraulic hoses
1. Place yellow and white on the top of the opera-
ting column.
2. Attach red directly to the unit.
3. Connect blue to K1 of the operating column.
4. Cut the cover panel to length and mount.
95

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Power lift hf 3s 3500Power lift hf 3s 4000Hymax hf 3s 3000Hymax hf 3s 3500Hymax hf 3s 4000

Tabla de contenido