Descargar Imprimir esta página

KPS DT30 Manual De Funcionamiento página 13

Publicidad

Idiomas disponibles

Idiomas disponibles

KPS-DT30 • Voltage tester
Never connect the voltage tester to voltage for
more than 30 seconds (Maximum connection
period allowed = 30 s.). Connect the electrodes
ut on
(1) on test handles (A) and (B) to the active line
the
and the earth line of the power supply controlled
ssary
by the earth leak circuit breaker to be tested.
tage
Press the button (3) to make the test. Never
keep the button pressed down for more than 2
M Ω.
seconds.
s (A)
If the earth leak circuit breaker acts, the supply
system is protected against earth leaks. If it does
not act, the earth leak circuit breaker is defective
elec-
or there is no circuit breaker installed.
up.
7. Technical information.
n on
Nominal voltage scale: 12 to 690 V AC/DC.
Internal resistance: 20 KΩ.
car-
Screen levels: LED ± 12V, 50V, 120V, 230V,
400V and 690V ~.
Maximum current input level: Is = 52 mA.
Continuity test no-load voltage: maximum 5 V.
pole.
MΩ.
Test current: maximum 5 µA.
s (A)
Nominal frequency scale: 0 < f < 500 Hz.
Maximum on time allowed: 30 seconds.
Operating temperature: -10º C to 50º C.
elec-
Protection: IP 54, DIN 400500.
up if
Weight: 183 gr.
irec-
Connection cable: 920 mm in length.
Earth leak test current: 32 mA.
ker.
Indicator with LED.
n the
13

Publicidad

loading

Este manual también es adecuado para:

602350009