Installing Components - Waeco DC-Kit2 Instrucciones De Montaje

Ocultar thumbs Ver también para DC-Kit2:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 61
DC-Kit2
7.2

Installing components

I
NOTE
DC Kit 2 contains two different remote controls for the inverter:
 CA2500, B2200, B1600 Plus: remote control FB1 (is
included in the scope of supply of the inverter)
 B1600: remote control FB2
➤ Install the ECL-102 charging current distributor.
➤ Install the PP2002 inverter.
➤ B1600: Fit remote control FB2 in an easily accessible location in the
vehicle.
D
DANGER! Electrocution
Only connect the battery once you have the completed all the
installation work and you are certain it has been done properly.
7.3
Connecting the CA2500 Dometic roof air
conditioner
➤ Remove the air outlet of the roof air conditioner ( CA2500) (fig. 1,
page 3).
➤ Cut the cable loop of the CA2500 on/off cable through the middle
(fig. 2 A, page 3).
➤ Connect the control cable to the on/off cable (fig. 2 B, page 3).
➤ Lay the control cable of the roof air conditioner to the ECL-102 charging
current distributor.
➤ Cut off round system plug (fig. 2 C, page 3).
➤ Connect both ends of the cable with connections I2 and I3 of the charging
current distributor ( ECL-102) (fig. 3 1 and 2, page 4).
➤ Attach the air outlet of the roof air conditioner ( CA2500) (fig. 1,
page 3).
➤ Run the connection cable of remote control FB1 to the inverter and
connect ( PP2002).
EN
Installing and connecting the DC kit
33

Publicidad

Tabla de contenido
loading

Tabla de contenido