Lubrication; Cold Weather Care - Hitachi NV 45AB2 Instrucciones Y Manual De Seguridad

Ocultar thumbs Ver también para NV 45AB2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English
Inspect the regulator
before operation to be
sure it operates properly.
Lubricator ..... The lubricator supplies an
oil mist to the Nailer.
Inspect the lubricator
before operation to be
sure
lubricant is adequate.
Use Hitachi pneumatic
tool lubricant.
Nailer Side
Lubricator
3. Air hose
Air hose must have a minimum working
pressure rating of 150 psi (10.4 bar 10.6
2
kgf/cm
) or 150% of the maximum
pressure produced in the system,
whichever is higher.
4. Air consumption
Using the Air consumption table and the
Air compressor size formula, find a
correct compressor size.
Air consumption table
psi
Operating
(bar)
pressure
(kgf/cm
Air
ft
3
/cycle
consumption (ltr/cycle) (.93) (1.1) (1.3)
Air compressor size formula
Amount of air required
=number of Nailers
× average nails driven each minute
per Nailer
× air consumption at given air
pressure
× safety factor (always 1.2)
Example: 2 Nailers operating at 100 psi
driving 30 nails per minute
the
supply
of
Regulator
Compressor
Side
Filter
80
90
100
(5.5) (6.2) (6.9)
2
) (5.6) (6.3)
(7)
.033 .039 .046
— 12 —
Amount of air required
=2 × 30 × .046 (1.3) × 1.2
=3.3 CFM (ft
3
/min) (94 ltr/min)
After making the calculations as shown
above, you should find a compressor
providing 3.3 CFM of air that is required.

LUBRICATION

It is important that the Nailer be properly
lubricated.
Without proper lubrication, the Nailer will not
work properly and parts will wear
prematurely.
Use Hitachi pneumatic tool lubricant.
Do not use detergent oil or additives.
These lubricants will harm the O-rings
and other rubber parts. This will cause
the Nailer to malfunction.
Filter-regulator-lubricator units should
always be used.
Keep the lubricator filled with Hitachi
pneumatic tool lubricant.
If a lubricator is not available, supply 5 –
10 drops of Hitachi pneumatic tool
lubricant into the air plug on the Nailer
twice a day.

COLD WEATHER CARE

Do not store the Nailer in a cold weather
environment.
Keep the Nailer in a warm area until
beginning the work.
If the Nailer is already cold, bring it in a
warm area and allow the Nailer to warm
up before use.
1 Reduce the air pressure to 64 psi (4.4
bar
4.5 kgf/cm
2 Remove all nails from the Nailer.
3 Connect the air hose and free-fire
(blank-fire) the Nailer.
The lowered air pressure will be
enough to free-fire the Nailer.
Slow speed operation tends to warm
up the moving part.
CAUTION
Do not free-fire the Nailer at high
pressure.
2
).

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Nv 45ab2s

Tabla de contenido