Installation And Start-Up - Cebora SYNSTAR 270 T Manual De Instrucciones

Ocultar thumbs Ver también para SYNSTAR 270 T:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 33
C
D
4 CONTROLS LOCATED ON REAR PANEL.
E
F
G
12
E – GAS PIPE CONNECTION.
F – SWITCH.
Starts and stops the machine
A
G – MAINS CABLE
B
I - FUSE HOLDER.
L – SOCKET.
H
Socket which receives the power cord from the cooling
unit Art.1681 (optional).
M – PRESSURE SWITCH CONNECTOR.
Connector which receives the cable from the pressure
switch Art.1681 (optional).

5 INSTALLATION AND START-UP

Position the welding machine so as to allow the free circulation
of air inside and, as much as possible, prevent metal or other
dusts from penetrating.
• The machine must be installed by professional personnel.
• All the connections must be performed in compliance
with applicable standards (IEC/CEI EN 60974-9) and with
accident-prevention laws.
• Make sure the power supply voltage corresponds to the
welding machine rating.
• The protection fuses must be sized according to the details
shown on the technical data plate.
I
• P osition the cylinder on the support and fix it with the 2
straps; ensure that the straps are secured tightly to the
cylinder to prevent dangerous tilting.
• Connect the gas hose to the outlet of the pressure regulator.
• Open the side door.
• Connect the power cord to the socket D and through
M
the clamp to the workpiece.
• Connect the earth lead clamp D to the piece to be welded.
L
• Fit the wire coil on the support inside the compartment.
The coil must be fitted so that the wire unwinds in an
anticlockwise direction.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

324Synstar 250mSynstar 200 mSynstar 200 t

Tabla de contenido