Installation And Start-Up - Cebora SYNSTAR 330 TS Manual De Instrucciones

Ocultar thumbs Ver también para SYNSTAR 330 TS:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 69
15 – SOCKET.
Socket which receives the power cord from the cooling
unit Art.1681 (optional).
17 – SOCKET to which you should connect the electrode
holder in MMA welding or the TIG torch power connector.
18 – SOCKET Socket to which you should connect the
cable connector of the power source-trolley connection
service cable.
19 – PLUG to which you should connect the cable
connector of the power source-trolley extension power
cable.
20– SOCKET to which you should connect the cable
connector of the power source-trolley connection service
cable.
21 – GAS HOSE, TIG WELDING.
22 – SOCKET (OPTIONAL) to which you should connect
the cable connector of the Data Logger art.408 (optional).
18
17

5 INSTALLATION AND START-UP

• Position the welding machine so as to allow the free
circulation of air inside and, as much as possible, prevent
metal or other dusts from penetrating.
• The machine must be installed by professional personnel.
• All the connections must be performed in compliance
with applicable standards (IEC/CEI EN 60974-9) and with
accident-prevention laws.
• Make sure the power supply voltage corresponds to the
22
welding machine rating.
• The protection fuses must be sized according to the details
shown on the technical data plate.
• All power sources must be fitted with axle and then rear
wheels (fig. 2) .
• For machines with trolley, the pivoting system must
be mounted both on the wire feeder trolleys and the
power source; the small wheels provided together with
the screws must be mounted at the bottom of the wire
feeder trolley as well as the welding torch support, then
place the trolley in its position. (see figure 3).
12
13
10
14
15
Fig. 2
Fig. 3

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

388

Tabla de contenido