Descargar Imprimir esta página

Periodic Inspection Of The Breaker; Checking The Breaker; Important - Canon ImageRunner advance 6275i Guía De Usuario

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Periodic Inspection of the Breaker

This machine has a breaker that detects excess current
or leakage current. Make sure to test the breaker once
or twice a month using the following procedure.

IMPORTANT

Make sure that the main power is turned OFF, before
inspecting the breaker.
If a malfunction occurs after an inspection, contact your
local authorized Canon dealer.

Checking the Breaker

1
Push the test button on the rear of the
machine with the tip of a ball-point pen, or a
similar object.
IMPORTANT
Briefl y push the test button.
NOTE
The breaker is located on the rear of the machine.
For more information on the location of the breaker,
see "External View, " on p. 34.
2
Confi rm that the breaker lever is switched to
the OFF (" " side) position.
IMPORTANT
Do not use the test button to turn the power ON and
OFF.
If the breaker lever does not switch to the OFF
(" " side) position, repeat step 1.
If the breaker lever does not switch to the OFF
(" " side) position, despite carrying out the above
procedure two or three times, contact your local
authorized Canon dealer.
1
3
Switch the breaker lever to ON ("I" side).
4
Turn ON the main power.
1. Open the main power switch cover.
2. Press the main power switch to the "I" side.
3. Close the main power switch cover.
5
Fill in the check sheet, located on the
next page, to document your periodic
inspections of the breaker.
Preface
21

Publicidad

loading

Este manual también es adecuado para:

Imagerunner advance 6265iImagerunner advance 6255i