Maintenance And Inspection - Metabo HPT M 12V2 Instrucciones De Manejo

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MAINTENANCE AND INSPECTION

WARNING:
1. Inspecting the screws
Regularly inspect all screws and ensure that they are fully tightened. Should any of the
screws be loosened, retighten them immediately.
WARNING:
2. Maintenance of the motor
The motor unit winding is the very "heart" of the power tool. Exercise due
care to ensure the winding does not become damaged and/or wet with oil or
water.
3. Service and repairs
All quality power tools will eventually require servicing or replacement of parts because
of wear from normal use. To assure that only authorized replacement parts will be
used, all service and repairs must be performed by a metabo HPT AUTHORIZED
SERVICE CENTER, ONLY.
4. Service parts list
A:
Item No.
B:
Code No.
C:
No. Used
D:
Remarks
CAUTION: Repair, modification and inspection of metabo HPT Power Tools must be
carried out by a metabo HPT Authorized Service Center.
This Parts List will be helpful if presented with the tool to the metabo HPT
Authorized Service Center when requesting repair or other maintenance.
In the operation and maintenance of power tools, the safety regulations and
standards prescribed in each country must be observed.
MODIFICATIONS:
metabo HPT Power Tools are constantly being improved and modified to
incorporate the latest technological advancements.
Accordingly, some parts (i.e. code numbers and/or design) may be changed without
prior notice.
Be sure to switch power OFF and disconnect the plug from the
receptacle during maintenance and inspection.
Using this router with loosened screws is extremely dangerous.
English
17

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

M 12sa2

Tabla de contenido